City House

CDD Ltd were appointed for the RC Detailing provision of the vertical elements, base slab, lift pit and upper slab on this project.

This development was to create a more contemporary workspace where forward thinking businesses of all shapes and sizes could connect to the vibrant city of Leeds. The 120,000 sq. ft. development aimed to provide flexible space from a single desk for a day to a whole building for 25 years.

This was to be a hybrid building where the core is concrete but the main frame comprised of steel work with composite decking upper slabs, so brought slightly different considerations to the planning process than conventional methods. We have extensive experience with hybrid buildings though, so it wasn’t a problem for us at all.