Our Projects

All ProjectsResidentialStudent AccomodationMixed UseTransportOfficesLeisureEducationIndustrialHealthcarePublic SectorEnergy

4 Wellington Place

Due for completion Q4 2020, 4 Wellington Place is one of the most exciting new pre-let opportunities in Leeds. The statement building offers high quality grade A office and retail space with rooftop terraces and views over Tower Square. The generous boulevards and feature reception provide a true sense of arrival to one of Leeds’ most sought-after business locations.

Tilbury 2

The proposed Tilbury 2 port will be constructed on land that formed the western part of the old Tilbury Power Station. The site will be developed with a RoRo terminal and specialist construction materials and aggregates terminal, which will also have facilities to produce asphalt and concrete products. On the marine side, an existing jetty on the river will be lengthened to accommodate three vessels at any one time and the onward transportation of goods by barge to London.

Active Travel Cycleway Bridge, Newtown

The new 60 metre span bridge is due for completion in 2020 and will link the north and south sides of the River Severn, making for ‘green’ travel and convenient access to local businesses.

University of Nottingham

The latest development proposed at Jubilee Campus is the Power Electronics and Machines Centre (PEMC). This is to be situated adjacent to the recently completed RAD Building. The facility will provide office accommodation, laboratory, workshop space, meeting rooms and ancillary spaces for the Power Electronics, Machines and Control Group within the Faculty of Engineering.

Basing View

Basing View is the town’s central business district, delivering new Grade A office accommodation supported by other complementary uses including residential, retail and leisure. Supported by excellent public transport links, it offers a truly sustainable environment. A vibrant new urban quarter, Midtown will be the heart of the development. A range of uses will be delivered together with high-quality public realm to provide a place to socialise and work. Work has already started on the speculative development of a new Grade A office of 60,000 sq ft.

Winchester Sports and Leisure Centre

The multi-million pound scheme will include a flexible 50m swimming pool, along with a learner pool and splash area, as well as an eight-court sports hall. The site will also feature eight treatment and therapy rooms, a gym with 200 stations, two large studios for exercise classes, a spin studio with around 60 bikes and a cafe.

Potato Wharf

Potato Wharf is a contemporary collection of 1 & 2 bedroom canal-side apartments. Located in Castlefield, Manchester, Potato Wharf is close to the City Centre as well as the shops and restaurants of Spinningfields. The development blends the best of city living with open green spaces and has been designed with sustainability in mind.

Victoria Riverside

CDD Ltd was appointed to undertake RC detailing of the ground beams. Located on Atkinson Street in the Hunslet area of Leeds, Victoria Riverside is a sympathetic conversion of the former Hunslet and Victoria flax spinning mills which have laid derelict for over 40 years. On completion the full scheme will extend to approximately 350 apartments including spectacular roof top penthouses and a convenience store.

Earls Gate

Planning was obtained in January 2017 for a 215,000 tonne per annum facility to provide a replacement CHP facility to support the Earls Gate Energy Centre (“EGEC”). Beside providing a high quality residual waste solution built using the best available proven technology in the world, the heat and power generated by the plant will be used to support four different chemical operators in the Earls Gate site. The plant will be replacing an old gas fired plant. The heat and power off-take will make the Earls Gate plant one of the most efficient in the UK, helping to drive the shift from fossil fuels to heat and electricity from renewable sources.

Planning was obtained in January 2017 for a 215,000 tonne per annum facility to provide a replacement CHP facility to support the Earls Gate Energy Centre (“EGEC”). Beside providing a high quality residual waste solution built using …

Exeter – St Sidwells Point

The St Sidwell’s Point Leisure Complex will include an eight-lane main pool, a learner pool with moveable floors, a 150-station gym, a soft play area, a cafe and a creche.

Assembly, Bristol

An impressive waterfront development in the heart of the city, Assembly Bristol offers a range of unique spaces and a mix of uses across its 1.52 acre site. Its flexible design and occupier-led scheme will create a community-based workplace in a connected urban district.

Edgeware Road, London

CDD Ltd was appointed to undertake RC detailing of the full concrete frame. The development comprises of 122 residential units and 18,500ft2 of retail space along with 29,500ft2 of amenity space in four blocks. These range in height from three to 18 storeys and are all connected by a podium at first floor. Ground floor areas below buildings provide car parking.

Blackwall Reach

The new Blackwall Reach development is part of a £300 million project aimed at transforming what is already one of London’s most exciting areas with a collection of spectacular properties in this prime location just a short distance from one of London’s most prominent locations, Canary Wharf. The new development is part of a five-stage process that will see a wealth of new properties to buy in Blackwall along with shops, improved transport links, community facilities and lush open spaces. It is set to be one of the largest new developments in London creating 1,575 new homes on a 20-acre site right beside the Blackwall DLR station and less than a mile away from the hustle and bustle of the Canary Wharf business district.

Laindon Centre

Laindon Centre is a residential development including the demolition of the existing shopping centre and providing 88 new CLT freehold houses, 136 residential flats split over five blocks and the creation of a new high street with retail units.

Mustard Wharf

Mustard Wharf has permission for 250 homes as well as 8,640 sq ft of commercial and amenity space. Close to from Leeds Train Station and next to the landmark Tower Works site and Candle House, the central scheme is situated in Granary Wharf, an established retail, leisure and residential location.

West Drayton

West Drayton is a former industrial site which will be created into a new waterfront residential development of 87 units contained within four separate blocks.

Embankment West

Embankment West provides 356 private rental apartments and 147 medium term aparthotel units across three towers. The towers are 17, 15 and 17 storeys respectively and are each served by a single core with extended travel distances.

University of Bristol

The University of Bristol development will include academic teaching space and a student village that will accommodate 1,500 students, as well as a gym and health centre. In addition, there will be the world’s first open access Quantum Technologies Innovation Centre. The project will provide an extensive public realm focused on improving neglected areas of the harbour, providing new cycle paths and walkways, public spaces, cafes and other facilities.

Sutton Court

Civil and Structural Design of a 23 storey PRS tower, Sutton Court, South London. Sutton Court is made up of 82 one and two bedroom apartments, each designed with hallway-free open-plan interiors.

Holdenhurst Road

Holdenhurst Road is a fifteen storey concrete frame and will provide 392 student bedrooms and over 2900m2 of academic space for Bournemouth University

Weavers Quay

Weavers Quay will provide 1,2 & 3 bed rental apartments from spring 2019 onwards, complete with residents’ club room, 64 on-site car and 130 on-site cycle spaces, and a 24-hour concierge service.

Wilton Efw (Teesside)

CDD Ltd were appointed to undertake various aspects of RC detailing on this and other Efw's. Teesside Energy from Waste plant (also known as Teesside WTE power station or Haverton Hill incinerator) is a municipal waste incinerator and waste-to-energy power station. Wilton Efw provides 29.2 megawatts(MW) of electricity for the National Grid by burning 390,000 tonnes of household and commercial waste a year. It is located on the River Tees at Haverton Hill, east of Billingham in North East England. Operated by SITA UK since its conception, the plant replaced the Portrack Incinerator and opened in 1998.

Hull Police Headquarters

New Humberside Police Headquarters. CDD Ltd provided our services directly to the Consulting Engineer with works including a reinforced frame including foundations, slabs, shear walls, beams and columns.

2 Dove House Street

Planning has been granted for this high-end development which blends luxury residential units with extra-care facilities in the heart of Chelsea. The part 5 part 6 storey building plus a 2 storey basement will comprise of 55 units and include communal and wellbeing facilities.

Maggies Bart

Maggie’s and Barts Hospital are working in partnership to bring a new cancer support centre to London. Maggie's Barts is expected to open late 2016. A three-storey "urban townhouse", the new Centre has been designed to an exceptionally high quality and will be full of open space and light created through a layering of materials. The exterior works in harmony with the interior and has been very carefully thought out – allowing natural light to wash over the floors and walls, ever changing through the natural daylight pattern of the seasons.

Haven Green (London)

CDD Ltd was appointed to undertake all RC detailing of the foundations and frame This project will provide a new dental practice including 10 dental surgeries, waiting and reception areas, offices, welfare facilities, library and ancillary rooms over three levels.

Haribo Factory (Castleford)

CDD Ltd were appointed to undertake various aspects of RC detailing including cores, stairs and flat slabs including shear reinforcement Sweets maker Haribo's new £92m factory that will create almost 300 new jobs in West Yorkshire. The production facility based in Castleford will produce 48,000 tonnes of sweets each year.

Southampton Solent University Sports Building

A new £28 million state-of-the-art sports facility is to be built in the centre of Southampton. Southampton Solent University’s new facility will include two new sports halls, three fitness studios and two gyms on its East Park Terrace campus. It is the latest step in an ongoing £100 million development plan which the university hopes will transform its campus. The new structure will sit alongside the £33 million Spark building and link to the rest of the campus site.

Queensferry High School

City of Edinburgh Council has granted planning consent for the construction of a £40m Queensferry High School. A green light for the 1,200-place school emphasizes physical education with a sports hall, six-lane swimming pool and a 3G sports pitch in addition to a running track. Built on the current school’s playing field, which will be demolished post-completion to provide additional landscaping and pitches.

The University of Edinburgh

CDD have been appointed to complete the RC Detailing of the concrete frame including basement and foundations. The University of Edinburgh is progressing a £32m Innovation Centre and Campus Hub at its Easter Bush Campus. The new building will provide laboratory and office space alongside a public outreach center and hub facilities. for all based at the campus. The building will stand as the sole structure within a landscaped, car-free strip stretching the full extent of the Easter Bush Campus.

MMU

CDD have been appointed to complete the RC Detailing for the full concrete frame and the basement. Plans for Manchester Metropolitan University’s new flagship Arts and Humanities building have been given the green light by Manchester City Council. The new Arts and Humanities building will provide outstanding state of the art facilities including theatre spaces, a Poetry Library and a new University Language Centre and be home to a diverse mix of arts and humanities courses.

Bower Ashton

CDD have been appointed to provide RC Detailing for the full concrete frame. The University of West England is forging ahead with exciting developments at the Bower Ashton Campus in the south of the city. The plans include demolition of three of the current blocks at Bower Ashton Campus and the addition of three new three storey buildings that will house both Digital Media and Physical Making Resources. Refurbishment of remaining blocks will include development of a student hub and the entire site will benefit from improved vehicle, pedestrian and cycle access and related facilities.  The student hub will bring together catering, retail, Students Union, Student Support Services, Library, and IT support.  A new entrance supports the Drama facilities, giving students the potential to offer public performances in an easy-to-reach space.

Barnsley Library

CDD have been appointed to complete all the Reinforcement Detailing for the exposed concrete frame. Barnsley town centre is undergoing a huge development including the opening of a brand new central library in 2017. The futuristic, £4 million, purpose built library which is local to our head office is part of a £50 million town centre redevelopment programme to attract visitors to and investment in the borough. The library will have a transparent glazed skin that emits light to illuminate the new public town square.

MECD

MECD will deliver a sense of vibrancy by consolidating and welcoming the four engineering Schools into the heart of the campus. The University of Manchester has embarked on a £1 billion ten year plan to create a world-class, single campus for their students, staff and visitors. The new engineering campus will provide a range of modern facilities in a bespoke environment, to support the excellent research, teaching and learning in the 21st century.

York University

CDD Ltd was appointed to undertake RC detailing of pile caps, ground beams and retaining walls. Phase 2 of the department of biology will see the construction of a new three-storey, purpose building teaching and laboratory facility which will be adjacent to the first phase biomedical and natural sciences building.

South Shields Central Library And Digital Media Centre

CDD Ltd were appointed to undertake all RC detailing. The Central library and digital media centre will have extensive digital media facilities and display spaces incorporated into the building, providing residents and visitors to the borough with a fully interactive and educational, virtual reality experience - offering something new with every visit.

Sheffield University CTI

CDD Ltd were appointed to undertake RC detailing of the raft foundation. A 13,000 sq. ft. extension to the existing casting technology international facility so that it can be the only place in the UK that can produce large scale titanium castings for the next generation of aircraft.

Fenby Avenue Academy (Bradford)

CDD Ltd were appointed to undertake all substructure RC detailing. A new secondary academy school in Bradford will provide new sporting facilities for the surrounding community. The Academy will have a capacity for 1,050 students.

Factory 2050 (Sheffield)

CDD Ltd were appointed to undertake all substructure RC detailing. Factory 2050 Is a £43 million stunning circular building will combine a range of technologies, including advanced robotics, flexible automation, unmanned workspace, off-line printing in virtual environments linked to plug-and-play robotics, 3D printing from flexible automated systems, man-machine interfaces, and new programming and training tools.

Durham University

CDD Ltd were appointed to undertake RC detailing of the foundations and vertical elements. Durham University’s £48m development is positioned at the edge of the university’s science site along Stockton road will sustain 200 construction jobs in the local economy. The development will house a major library extension, a new law school and a student services building which will be known as the palatine centre.

Wakefield Swimming Pool & Fitness Centre

New £10m Wakefield Swimming Pool in Wakefield city centre, includes two pools, a fitness centre, a 200-seater viewing area and a cafe. CDD Ltd provided our services directly to the Consulting Engineer. The works included reinforced foundations, basement walls, swimming pools and upper floors.

Leeds Arena

CDD Ltd were appointed to undertake all RC Detailing on all foundations, retaining walls and ground slabs. New Arena located on the old Leeds Metropolitan University site to the North of Leeds City Centre adjacent the ring road.

Grimsby Leisure Centre

CDD Ltd were appointed to undertake all substructure RC detailing. This new facility will include a 25 metre, eight lane swimming pool with learner pool, sauna, steam room and associated wet changing facilities. There will also be a gym fitness suite with studio space and associated dry changing facilities.

Doncaster New Performance Venue

New Performance Venue located on Doncaster. Fully reinforced concrete structure with basement and fly tower walls, CDD Ltd were appointed by the Consulting Engineer. What’s in the box? a great 620-seat theatre featuring class acts and top performers, great sightlines, crystal-clear sound, comfortable seats and the best ice-cream. a second auditorium flexible enough to show live bands, comedy, drama and dance, off-the-wall comics and off-the-ceiling cabaret artists. a stunning dance studio - for anyone who wants to dance for fun, to get fit or to find new challenges, and for watching dance performance too. a super little drama studio, for workshops, rehearsals and very close-up performance. an edgy drama studio, for workshops, rehearsals and intimate performance. a foyer café/bar, to meet your friends, have a coffee, buy your tickets, catch some music and watch the world go by in the new public square.

Landmark, Manchester

Manchester city centre is set for another sleek office block, right next No 1 St Peter’s Square. The £100m Landmark Manchester is due to be delivered in the first half of 2019.

Florence Building

The Florence Building is a brand new 5-storey 60,546 sq ft office development in the heart of Basingstoke, Hampshire. With flexible internal floorplates The Florence Building will offer the lowest cost per workstation in the South East.  The interior will be finished to a full Cat A standard including air-conditioning, suspended metal ceilings, lighting and raised floors.  A contemporary reception area will feature a double-height glazed atrium space. The site will additionally provide secure parking for 203 cars, electric car charge points and 48 secure and covered cycle spaces. Basing View, the location for the Florence Building, is a major town centre business cluster spread over 65 acres and is home to a range of national and international organisations.

Princess Building (Halifax)

CDD Ltd were appointed to undertake RC detailing of all foundation elements, retaining walls, ground slab and columns. The refurbishment of the grade II listed Princess Buildings in Halifax will include the modernization of the buildings to make them more energy efficient, but will maintain many historic architectural features. The exterior of the building will be complemented by a completely redesigned interior and a modern extension to the rear is to be built to allow easy access through and around the building.

One Valentine Place (London)

CDD Ltd were appointed to undertake all RC detailing. One Valentine Place is a new-build which has seven-storeys on Blackfriars Road, offering 30,000 sq ft of grade-A office accommodation. The exposed insitu concrete frame is clad in anodised aluminium and high-performance solar-control glazing, featuring a double-height entrance storey, generous external terraces, and views towards the City of London. One Valentine Place is located in the heart of Southwark on Blackfriars Road, just 150 yards from the landmark Palestra Building and Southwark Tube Station.

City House (Leeds)

CDD Ltd were appointed to undertake RC detailing of vertical elements, base slab, lift pit and upper slab. This development will create a more contemporary workspace which where forward thinking business of all shapes and sizes can connect to the vibrant city of Leeds. The 120,000 sq. ft. development will provide flexible space from a single desk for a day to a whole building for 25 years

Paddington Station (London)

CDD Ltd were appointed to undertake various aspects of RC detailing. The Cross Rail Paddington Station will take the form of an underground box measuring 260m long, 25m wide and 23m deep, and located directly under Departures Road and Eastbourne Terrace. Construction will generate 160,000 cubic metres of excavation, 80,000 cubic metres of concrete and 15,000t of reinforcement.

Gatwick Airport (London)

A 1,100-space, multi-storey Car Park, comprising one ground floor level, plus six raised levels, at Gatwick Airport North Terminal. CDD Ltd were appointed by the Consulting Engineer. The works included Precast beams, columns, cores and floors.

Castleford Interchange

CDD Ltd were appointed to undertake RC detailing of all concrete elements on the projects which included foundations and ground slabs. This bus/heavy interchange project requires close liaison with a large number of stakeholders including Metro, Wakefield MDC, Network Rail and Northern Rail. The new facility will incorporate a single fully enclosed concourse giving direct access to the heavy rail platform and to all vehicle types including articulated buses.

Bond Street Station (London)

CDD Ltd were appointed to undertake various aspects of RC detailing Bond Street is in the heart of London’s West End, the busiest shopping district in the UK – serving tourists, residents and businesses in the area. More than 155,000 passengers use the existing Tube station daily. When Cross rail arrives in 2018, passenger numbers are anticipated to grow to over 220,000, daily.

Circle Square – Plot 9

Circle Square plot 9 has plans for an 18-storey student scheme. The latest plans involve the construction of an 18-storey apartment block featuring 384 one-bed apartments. It will also involve 2.852 sq ft of commercial space. There will also be a café and a social space to enjoy.

Project Cavendish

The current hotel on site will be knocked down to make way for a six-storey office block, the new home of HSBC. It will also include shops, bars and restaurants, some of which will be built on a newly-pedestrianised Charter Square. The 15,000 sq ft office block is the focal point of phase one and seen as a ‘catalyst’ for further development by the council. This is known as the Cavendish Building.

Circle Square

Circle Square has been given the green light for its latest application to accommodate a part-12, part-18 storey building which will include a hotel and an energy centre. The new building will become a key piece of the transport jigsaw for Circle Square, with a circle highway and improvements to Oxford Road to be part of an integrated transport infrastructure. This ‘hybrid’ building type will combine a number of different uses which is completely new to Manchester the 150-bed hotel will be from the 12th to 17th floors, while the 1,100 car-parking spaces will cover the ground to 11th floors. At ground level the building houses main entrances to the car park and hotel; as well as retail units and an Energy Centre.

Rochdale Riverside

Rochdale Riverside will create the prime core in the heart of the town centre completing the town centre regeneration. Comprising a comprehensive mix use development incorporating a M&S department store, retail and leisure units, a 6 screen cinema and adjoining car park inspiring public realm. 

Newcastle Learning and Teaching Centre

CDD have been appointed to provide RC Detailing for the sub-structure and super structure. Newcastle Learning and Teaching Centre will feature state-of-the art learning facilities for up to 2,200 students across three floors. The Centre will also provide exhibition space, café and expansive social learning spaces. The 82,000sqft building, scheduled to be complete in Autumn 2019, will be a flagship development for Newcastle University and will be its third building on Science Central, the former brewery and one-time colliery site on the edge of Newcastle city Centre.

Wellington Place (Leeds)

CDD Ltd were appointed to undertake all RC detailing on plots 5 and 6. Located in the centre of Leeds, the region’s business, financial and social capital, Wellington Place will be one of the biggest and most prestigious new city centre business quarters in Europe. Combining 1.5 million sq ft of commercial, retail, leisure and residential space, the vision is for Wellington Place to be an exciting place to work, live and visit. A community built on the traditions of the city, but with the future in mind.

Flemingate (Beverley)

CDD Ltd were appointed to undertake RC detailing of all concrete elements on the projects which included foundations and ground slabs. The mixed use retail, leisure and commercial scheme will be the largest development of its kind in the town, creating an estimated 300 new jobs during construction and more than 700 permanent jobs.

Blackburn Cathedral Quarter

CDD Ltd were appointed to undertake all substructure RC detailing. This transformation across this 17 hectare site is set to create a special meeting place and gateway to the town providing a unique and characterful place in the heart of Blackburn. This regeneration will provide new public and private open spaces in and around the Cathedral and in front of the main railway station and bus interchange. A series of new office, retail and hotel buildings will be constructed incorporating a modern urban design and raising the standard of the quality of accommodation within the town centre.

Oxford Road

Oxford Road comprises of 430-bed student development on Oxford Road in Bournemouth. The 16-storey development is a high-quality, cluster-led scheme with extensive communal facilities of the Lansdowne campus of Bournemouth University.

Crown House (Sheffield)

Crown House is set to become a 350-bed student flat complex and this development on West Bar will involve the vacant offices being converted into apartments for students at both city universities. The development will sit directly opposite Sheffield Crown Court and plans to spend £20m building two more blocks to create a 350-bed complex set to include apartments, a gym, study and cinema. Walker Modular will provide Bathroom Pods for the new student block which is set to open by the start of the 2017-2018 academic year.

The Bottle Store (London)

CDD Ltd were appointed to undertake all RC detailing. The Bottle Store will provide a 350 bed student residence plus a 38 unit affordable housing scheme. Also it will have 24,000 sq ft of employment space, most of which is dedicated to specialist, low cost artist studios.

Sovereign House (Sheffield)

CDD Ltd was appointed to undertake RC detailing of strengthening works of cores Sovereign house was a conversion project it the heart of Sheffield that provides a mix of beautiful studio and 1-bedroom apartments that are perfect for the influx of students in the area.

Broad Lane (Sheffield)

CDD Ltd were appointed to undertake all superstructure RC detailing. Development on broad lane will bring a complex of en suite flats for students on the doorstep of the University of Sheffield and will accommodate 224 students.

Bath Lane (Leicester)

CDD Ltd were appointed to undertake all aspects of RC detailing. This project includes the construction of the 601 bedroom student accommodation development, including ancillary management and communal facilities and ground floor commercial units. The project also includes provision of associated parking, highway improvement work, amenity space and landscaping.

Crusader Works

The 25 million developments will turn the disused factory into a new city centre residence, with over 200 new apartments. There will be a new land-scaped courtyard, with provisions for 201 cycle parking spaces. Crusader work poses a unique opportunity, offering an exciting change to regenerate a central Manchester site steeped in History and character.

Hunter Street

The Development of Hunter Street consists of 77 beds.  The development is anticipated to be completed in the summer of 2018. This adds to the 330 student beds already being developed in Chester.

Wood Wharf (London)

The Wood Wharf project is a redevelopment of a 13.6 acre site in Canary Wharf.  The development will deliver 3,500 homes, including 607 affordable homes, as well as 2.8m sq ft of offices, shops and leisure facilities in 30 new buildings. Completion of the first phase of the plans will coincide with the arrival of Crossrail in 2018.

Lillie Square (London)

CDD Ltd were appointed to undertake all substructure and superstructure RC detailing. The development will feature distinctive contemporary architecture. Rich in variety, it draws from the heritage of west London, referencing and re-interpreting traditional garden squares, mansion blocks and town-houses with generous proportions and the finest materials.

Hackney Road (London)

CDD Ltd were appointed to undertake various RC detailing The property consists of a recently developed building offering mixed use accommodation arranged over four floors. The property offers retail space on the ground floor with residential accommodation on the upper floors.

Adelphi Wharf (Manchester)

CDD Ltd were appointed to undertake all RC detailing of all elements excluding BAMTECH slabs. Adelphi Wharf is a £76 million riverside regeneration project that is located near Manchester city centre, in the heart of Salford. The development will deliver over 500 residential apartments for Manchester’s young professionals. Phase one contains 206 residential units, including townhouses, studios and 1, 2 and 3 bedroom apartments.

Sheffield Hallam Campus

Sheffield Hallam University's Collegiate Campus is a major £25 million investment project which will create impressive new facilities in the leafy grounds. CDD Ltd were appointed to undertake all aspects of RC detailing of this project. The development will result in a completely new building in place of the current Heart of the Campus, with a new café, glazed atrium, lecture theatre, study areas and social spaces. The three storey building will be 7,200 square metres in size and will mainly be used by students and staff from the University's faculties of Development and Society, and Health and Wellbeing.