Heart of the City II
CDD was appointed to undertake the RC detailing of the foundations and super structure for Blocks H2 and H3.
Block H2 will be a new building comprising approximately 70,000 sq ft of Grade A office space – serving 750 employees – is split across seven upper floor and includes an impressive south facing roof terrace. The visually striking, dark coloured metal building takes inspiration from Sheffield’s celebrated industrial past.
Proposals for the H3 element, to be known as Cambridge Street Collective, aim to retain as much of the existing fabric and façades along Cambridge Street and Wellington Street as feasible. Plans include a large, industrial-style space, suited to a food hall or similar sociable, communal offer. Complementary shops, a bar and restaurant, and an upper level leisure space would also be created.